Passive Fire Site Inspection

BMTech provides the following services:
- Registered Auckland Council PS4 authors
- Installation inspection/construction monitoring
- Final inspection/commissioning
AS1530.4 Fire resistance tests of elements of construction

AS1530.4

Fire resistance tests of elements of construction

Service penetrations and control joints

AS4072.1

Service penetrations and control joints

AS1905.1/NZS4520 fire resistance doorsets

AS1905.1
NZS4520

Fire-resistant doorsets

passive fire site inspection
Acceptable Solutions and Verification Methods of the C Clauses of the New Zealand Building Codeauckland-council

Producer Statement 4

Our design professionals can issue the statements stating that, in their view, the passive fire protection part of the building work as described on the consented plans and specifications has been constructed and meets certain performance requirements of the NZBC and or conditions of building consent.

IANZ & ILAC

Installation Inspection/  Construction Monitoring

Our team of qualified inspectors assist with installation inspections/construction monitoring of the following passive fire systems: walls, floors, roofs and ceilings, columns, beams, girders and trusses, doorsets and shutter assemblies, uninsulated glazing, air ducts, service penetrations and control joints, fire damper and air transfer grille assemblies, critical services. These passive fire systems can be inspected in new build/remediation projects in compliance with

  • AS1530.4
  • AS4072.1
  • AS1905.1
  • NZS4520
  • NZS/BS 476 part 20, 21, 22
  • Acceptable Solutions and Verification Methods of the C Clauses of the NZBC
IANZ & ILAC

Commissioning/
Final Inspection

Our inspectors perform the final inspection/commissioning of the following passive fire systems: walls, floors, roofs and ceilings, columns, beams, girders and trusses, doorsets and shutter assemblies, uninsulated glazing, air ducts, service penetrations and control joints, fire damper and air transfer grille assemblies, critical services. Final inspection/commissioning for these passive fire systems can be done for new build/remediation projects in compliance with

  • AS1530.4
  • AS4072.1
  • AS1905.1
  • NZS4520
  • NZS/BS 476 part 20, 21, 22
  • Acceptable Solutions and Verification Methods of the C Clauses of the NZBC

Site Inspection Process

site inspection processsite inspection process mobile